Electrical duct bank installation at the Canandaigua VA Medical
Personnel from USACE contractor Pike-P.J. Dick prepare to encase electrical conduits in concrete in order to deliver power to the future outpatient clinic and temporary kitchen, May 18, 2018. Photo courtesy of the Department of Veterans Affairs.

Download Image: Full Size (2.96 MB)
Photo by: the Department of Veterans Affairs |  VIRIN: 180814-A-PG036-002.JPG