Breach repairs on Buffalo Harbor North Breakwall
Completed repairs to the section of the Buffalo North Breakwater breached by a severe storm in October 2019 are shown in Buffalo, New York, September 30. The U.S. Army Corps of Engineers, Buffalo District and its contractor, Michigan-based Ryba Marine Construction Co. repaired in less than two months in 2021. (U.S. Army Photo by 1st Lt. Stacey Acapana)

Download Image: Full Size (0.08 MB)
Photo by: 1st Lt. Stacey Acapana |  VIRIN: 210930-A-A1409-004.JPG