Results:
Tag: NY/PA Operations and Maintenance
Clear
  • March

    Black Rock Lock’s Dewatering Pumps Repaired and Back in Position

    After a month of ongoing routine maintenance repairs, at Flygt Pumps in Rochester, NY, two dewatering pumps were safely and successfully re-installed back into the Black Rock Lock’s pump house, March 11 by the U.S Army Corps of Engineers (USACE), Buffalo District.