FUSRAP

Lake Ontario Ordnance Works Administrative Record

The administrative record file is a collection of documents that form the basis for the selection of a response action at an environmental restoration site. Under the Comprehensive Environmental Response, Compensation, and Liability Act, the U.S. Army Corps of Engineers is required to establish an administrative record for every remedial or response action under the Formerly Utilized Sites Remedial Action Program (FUSRAP).

The documents included in the Lake Ontario Ordnance Works administrative record file are arranged by subject code and are identified with unique numbers to assist in tracking and retrieval of the documents.

The index to the administrative record file is linked below.

Index of the Administrative Record File for the Lake Ontario Ordnance Works

In addition to the records located below the Buffalo District maintains a collection of records within the Administrative Record File that are not yet available electronically.  These records housed at the Buffalo District are listed in the index below. If you have questions, comments, concerns regarding the hard copy records of the LOOW Site, please send an e-mail to derpfuds@usace.army.mil. You may also mail a letter to:

USACE, Buffalo District
Attn: Special Projects Team - Outreach
1776 Niagara Street
Buffalo, NY 14207

or call us at 1-800-833-6390 (option 4).

Index of the Hard Copy Records of the Administrative Record Files for the Lake Ontario Ordnance Works 

01 Site Management Records

Collapse All Expand All
 01.01 Correspondence
 01.04 Site Photographs and Maps
 01.06 Reference Documents
 01.08 FUSRAP Eligibility

 

C02NY002502_01.08_0006_a - INPR Addendum No. 2 Packet - 12/19/2012

C02NY002504_01.08_0007_a - Findings and Determination of Eligibility - 07/15/1986

C02NY002504_01.08_0008_a - Proposed Property Addition is Part of the Original Property Described in the January 1988 INPR - 10/23/2006

C02NY002504_01.08_0009_a - New York District Requesting Review and Approval of Revised Findings and Determination of Eligibility - 07/18/2006

C02NY002504_01.08_0010_a - Buffalo District Forwarding Revised Findings and Determination of Eligibility for Approval - --/--/----

C02NY002504_01.08_0012_a - Revised Worksheet B-3 Inventory Project Report (INPR) Checklist - --/--/----

C02NY002504_01.08_0013_a - Amended Site Survey Summary Sheet - 03/23/2007

C02NY002504_01.08_0014_a - BD/DR Project Summary Sheet - 02/23/2007

C02NY002504_01.08_0015_a - CON/HTRW Project Summary Sheet - 02/23/2007

C02NY002504_01.08_0016_a - MMRP Project Summary Sheet - 03/23/2007

C02NY002504_01.08_0017_a - PRP/HTRW Project Summary Sheet - 02/23/2007

C02NY002504_01.08_0021_a - Headquarters Approving the Findings and Determination of Eligibility and Authorizing Funds for an RI/FS - 01/28/1987

C02NY002504_01.08_0022_a - Missouri River Division Forwarding Approval of Findings and Determination of Eligibility - 02/18/1987

C02NY002504_01.08_0023_a - Headquarters Recommendation and Subsequent Approval of the Findings and Determination of Eligibility - 10/30/1986

C02NY002504_01.08_0024_a - New York District Forwarding Recommendation of PRP/HTRW, CON/HTRW, and Two MMRP Projects - 10/15/2007

C02NY002504_01.08_0025_a - North Atlantic Division Approving the PRP/HTRW, CON/HTRW, and Two MMRP Projects - 03/03/2008

C02NY002504_01.08_0027_a - Transmittal of INPR Addendum #1 for Review, Concurrence, and Recommendation to the Division for Approval - --/--/----

C02NY002504_01.08_0028_a - Executive Summary for the the INPR - --/--/----

C02NY002504_01.08_0029_a - Headquarters Recommending 00 HTRW Project - 07/16/1986

C02NY002504_01.08_0030_a - INPR Addendum No. 2 Packet - 12/19/2012

C02NY002505_01.08_0006_a - INPR Addendum No. 2 Packet - 12/19/2012

C02NY002506_01.08_0502_a - Findings and Determination of Eligibility - 07/15/1986

C02NY002506_01.08_0503_a - Proposed Property Addition is Part of the Original Property Described in the January 1988 INPR - 10/23/2006

C02NY002506_01.08_0504_a - New York District Requesting Review and Approval of Revised Findings and Determination of Eligibility - 07/18/2006

C02NY002506_01.08_0505_a - Buffalo District Forwarding Revised Findings and Determination of Eligibility for Approval - --/--/----

C02NY002506_01.08_0507_a - Revised Worksheet B-3 Inventory Project Report (INPR) Checklist - --/--/----

C02NY002506_01.08_0508_a - Amended Site Survey Summary Sheet - 03/23/2007

C02NY002506_01.08_0509_a - BD/DR Project Summary Sheet - 02/23/2007

C02NY002506_01.08_0510_a - CON/HTRW Project Summary Sheet - 02/23/2007

C02NY002506_01.08_0511_a - MMRP Project Summary Sheet - 03/23/2007

C02NY002506_01.08_0512_a - PRP/HTRW Project Summary Sheet - 02/23/2007

C02NY002506_01.08_0516_a - Headquarters Approving the Findings and Determination of Eligibility and Authorizing Funds for an RI/FS - 01/28/1987

C02NY002506_01.08_0517_a - Missouri River Division Forwarding Approval of Findings and Determination of Eligibility - 02/18/1987

C02NY002506_01.08_0518_a - Headquarters Recommendation and Subsequent Approval of the Findings and Determination of Eligibility - 10/30/1986

C02NY002506_01.08_0519_a - New York District Forwarding Recommendation of PRP/HTRW, CON/HTRW, and Two MMRP Projects - 10/15/2007

C02NY002506_01.08_0520_a - North Atlantic Division Approving the PRP/HTRW, CON/HTRW, and Two MMRP Projects - 03/03/2008

C02NY002506_01.08_0522_a - Transmittal of INPR Addendum #1 for Review, Concurrence, and Recommendation to the Division for Approval - --/--/----

C02NY002506_01.08_0523_a - Executive Summary for the INPR - --/--/----

C02NY002506_01.08_0524_a - Headquarters Recommending 00 HTRW Project - 07/16/1986

C02NY0025--_01.08_0536_a.pdf - INPR Document Re: INPR Addendum No. 2 Packet

C02NY0025--_01.08_0537_a.pdf - Letter Re: Notification of Review and Approval Recommendation of INPR Addendum

C02NY0025--_01.08_0538_a.pdf - INPR Document Re: Transmittal of Attached Addendum 1 and Recommendation to Approve the Revised 00, 01, 02, and 04 and Proposed 10, 11, and 12 Projects

 01.09 Preliminary Assessment (PA) and Site Inspection (SI) Reports
 01.16 Project Management Plan (PMP) and Associated Documents

02 Removal Response

Collapse All Expand All
 02.01 Correspondence

C02NY002504_02.01_0500_a - Problems Identified During Site Visit to View IRA Component 2-Phase I Progress and Request for Responses to Concerns with Attached Photographs - 10/26/1998

C02NY002504_02.01_0502_a - Comments to Responses to Previous Comments for the TNT Pipeline and Chemical Waste Sewer Line Work Plan - 05/05/1999

C02NY002504_02.01_0517_a - Request for Approval of Proposed Plan to Address Possible Draining of Outfall Lines During Removal - 07/21/2000

C02NY002504_02.01_0527_a - Submittal of Burning Permit #2000-06 with Listed Conditions - 08/17/2000

C02NY002504_02.01_0528_a - Submittal and Explanation of EE/CA for the Proposed Interim Removal Action of the Drum Trench and Trash Pit, and Notification of Administrative Record File and Public Comment Period - 09/07/2000

C02NY002504_02.01_0529_a - Submittal and Explanation of EE/CA for the Proposed Interim Removal Action of the Drum Trench and Trash Pit, and Notification of Administrative Record File and Public Comment Period - 09/07/2000

C02NY002504_02.01_0530_a - Transmittal of Draft Proposal to Discharge Accumulated Rainwater for Excavation of Underground Piping - --/--/----

C02NY002504_02.01_0556_a - Approval to Dispose of PPE Material as Non-Hazardous Under the Approval No. M00-1453 - 12/20/2000

C02NY002504_02.01_0571_a - Review Comments for the Draft Scope of Work for the Underground Line Investigation - 06/07/2002

C02NY002504_02.01_0572_a - Review Comments for the Draft Scope of Work for Interim Removal Action at Area A - 06/17/2002

C02NY002504_02.01_0601_a - Transmittal of Attached Draft Proposal for the Discharge of Storm Water - 09/05/2000

C02NY002504_02.01_0614_a - Notification That a 1999 Hazardous Waste Report Must Be Submitted - 03/27/2000

C02NY002504_02.01_0615_a - Transmittal of Instructions and Forms for Submitting a 1999 Hazardous Waste Report - 03/13/2000

C02NY002504_02.01_0616_a - Notification That a 2000 New York State Hazardous Waste Report Must Be Submitted (with Handwritten Notes) - 07/23/2001

C02NY002504_02.01_0617_a - Transmittal of Completed 2000 Hazardous Waste Report - --/--/----

C02NY002504_02.01_0618_a - Transmittal of 1999 Hazardous Waste Report - --/--/----

C02NY002504_02.01_0622_a - Request for Confirmation of the EPA Generator ID Numbers and Addresses - 04/12/2000

C02NY002504_02.01_0644_a - Calculation of Preliminary Remediation Goals for Proposed Clean-Up Criteria for Boron and Lithium at Areas A and B - 07/29/1999

C02NY002504_02.01_0648_a - Transmittal of the Scope of Work for Area A and Request for Comments - --/--/----

C02NY002504_02.01_0650_a - Response to Comments on the TNT Walkover and Surface Removal After Action Report - 09/27/2004

C02NY002504_02.01_0651_a - Comments on the TNT Walkover Scope of Work - 04/12/2002

C02NY002504_02.01_0652_a - No Comments on the Revised TNT Walkover Scope of Work - 04/15/2002

C02NY002504_02.01_0663_a - Request to Leave Parts of the West Pile at the Site (with Handwritten Notes) - 01/10/2005

C02NY002504_02.01_0664_a - Possibility of Discharging Rain and Melt Water to Surface Waters - 02/22/2005

C02NY002504_02.01_0667_a - Transmittal of the EPA Identification Information for Wastewater Permit - 03/28/2005

C02NY002504_02.01_0669_a - Transmittal of Contaminated Materials Storage Area Pad Water Discharge Plan - 04/06/2005

C02NY002504_02.01_0671_a - Water Analysis from Baker Tank Exceeds Permissible Discharge Limit - 04/12/2005

C02NY002504_02.01_0673_a - Notification that Areas A and B Are Listed on the New York State Inactive Hazardous Waste Registry - 04/30/2002

C02NY002504_02.01_0674_a - Granted Request for Extension to the Submission Deadline for the 1999 Hazardous Waste Report - 04/19/2000

C02NY002504_02.01_0675_a - Correction to EPA Generator ID Number for the 1999 Hazardous Waste Reports - 04/13/2000

C02NY002504_02.01_0676_a - Transmittal of Attached Results of the Hazardous Waste Compliance Inspection - 01/14/2002

C02NY002504_02.01_0681_a - No Restrictions on the Use or Disposal of Contaminated Materials Storage Area Stone from the Northeast and Southeast Piles (with Handwritten Comments) - 01/10/2005

C02NY002504_02.01_0682_a - Details of the Contaminated Materials Storage Area Pad Removal and Stone Disposal - 04/18/2005

C02NY002504_02.01_0685_a - Update on the Removal of the Contaminated Material Storage Area - 11/19/2004

C02NY002504_02.01_0687_a - Request for Location of Radiation Measurements at the Contaminated Materials Storage Area Pad (with Handwritten Notes) - 01/10/2005

C02NY002504_02.01_0688_a - Confirmation That Backfill Material is Acceptable to Use as Clean Fill (with Handwritten Notes) - 01/11/2005

C02NY002504_02.01_0694_a - Update for the Technical Committee Regarding the Contaminated Materials Storage Area Pad (with Copy Sent to Stakeholders) - 01/07/2005

C02NY002504_02.01_0695_a - Transmittal of Explosive Data for the Baker Tank and Request for Information on the Proper Disposal Method (with Copy Sent to Stakeholder) - 01/07/2005

C02NY002504_02.01_0697_a - Transmittal of TCLP and Radiation Data for the Baker Tank - 01/04/2005

C02NY002504_02.01_0699_a - Transmittal of Radiation Count Rates from the West Pile at the Contaminated Materials Storage Area Pad - 01/04/2005

C02NY002504_02.01_0701_a - List of Questions to Be Discussed at the Technical Project Planning (with Handwritten Comments) - 03/07/2002

C02NY002504_02.01_0706_a - Notification That the Excavated Soil from the Chemical Waste Sewer Removal is Acceptable for Use as Backfill (with Copy Sent to Stakeholder) - 08/31/2000

C02NY002504_02.01_0775_a - Status Update for Phase I and II Interim Removal Action Activities - 07/21/1998

C02NY002504_02.01_0933_a - Review Comments on the September 7, 2000 EE/CA - 10/05/2000

C02NY002504_02.01_0939_a - Transmittal of the February 2, 2000 Demobilization and Closure Report - 05/09/2000

C02NY002504_02.01_0945_a - Transmittal of Nine Draft Documents for the Phase I Asbestos Interim Removal Action Component 2, for Review - 07/29/1998

C02NY002504_02.01_0946_a - Transmittal of Attached Completed Application for An EPA Identification Number and Attached Fact Sheet - 07/31/1998

C02NY002504_02.01_0947_a - Transmittal of Responses to An August 14, 1998 E-mail Regarding Component 2, Phase 1 and 2 - 08/24/1998

C02NY002504_02.01_0948_a - Transmittal of Nine Final Draft Documents for the Component 2, Phase 1 and 2 Interim Removal Action - 09/04/1998

C02NY002504_02.01_0955_a - Transmittal of Attached Responses to New York Department of Environmental Conservation October 26, 1998 Letter Regarding the October 15, 1998 Site Visit - 11/16/1998

C02NY002504_02.01_0958_a - Forwarding Attached Draft Response Letter Regarding Review of Responses to Comments for the Interim Removal Action - 05/04/1999

C02NY002504_02.01_0965_a - Receipt of Draft Submittals and Questions Issues Regarding the Phase 1 and 2 Interim Remedial Action - 07/31/1998

C02NY002504_02.01_0974_a - Comments on the Nine Draft Documents for Component 2 - Phase 1 Interim Removal Action - 08/11/1998

C02NY002504_02.01_0975_a - Findings from the September 10 and 11, 1998 Site Visit Regarding Potential Asbestos Containing Materials - 09/18/1998

C02NY002504_02.01_1007_a - Conditional Approval of the Final EE/CA for Operable Units 1 and 2 Pending Review and Approval of Technical Review Committee Meeting Minutes - 08/10/1995

C02NY002504_02.01_1012_a - Clarification of Position on Issues Raised During the December 4, 1997 Meeting on the 60% Remedial Design - 12/29/1997

C02NY002504_02.01_1013_a - Request for Information on Listed Issues Regarding the 60% Remedial Design for Component 1, Phase 2 and 3 - 01/18/1999

C02NY002504_02.01_1017_a - Request for Input on Cleanup Criteria for the 60% Remedial Design for Areas A and B Component 1, Phase 2 and 3 - 11/19/1998

C02NY002504_02.01_1021_a - Request to Forward Draft Work Plans Formal Comments for Responses (Copy Sent to Stakeholder) - 03/01/1999

C02NY002504_02.01_1024_a - Review Comments on the Draft Engineering Evaluation/Cost Analysis Report - 12/30/1994

C02NY002504_02.01_1030_a - Response to EPA and New York Department of Environmental Conservation Review Comments on the Draft EE/CA - --/--/----

C02NY002504_02.01_1032_a - Final Responses to Additional NYSDEC Comments on Phase II Addenda - 11/20/2000

C02NY002504_02.01_1040_a - Transmittal of Restricted Burning Permit #2000-05 with Considerations to Conditions Listed on Application - 08/04/2000

C02NY002504_02.01_1051_a - Approval of Application NB. M00-1390 for Waste Stream Disposal - 09/05/2000

C02NY002504_02.01_1055_a - Comments on the CSMA Pad Fact Sheet - 02/04/2005

C02NY002504_02.01_1064_a - Forwarding Comments on Various Draft Submittals for the Component 2- Phase I Interim Removal Action Submittals - --/--/----

C02NY002504_02.01_1077_a - Transmittal of the Final Cleanup of Asbestos Containing Material Report - 07/19/2000

C02NY002504_02.01_1086_a - Review Comments on the After Action Report, Walkover and Surface Removal of TNT - 08/17/2004

C02NY002504_02.01_1087_a - Response to Comments on the Waste Water Treatment Plant Investigation After Action Report - --/--/----

C02NY002504_02.01_1105_a - Review Comments on the After Action Report, UXO Activities at the Wastewater Treatment Plant - 08/17/2004

C02NY002504_02.01_1107_a - Repsonse to Provide a Schedule and Expedite the Interim Removal Action - 10/01/1997

C02NY002504_02.01_1108_a - Transmittal of the Attached Requested Revised Removal Action Schedule for EE/CA Phase - 08/25/1994

C02NY002506_02.01_0500_a - Transmittal of a Supplemental Work Plan for Additional Sampling for the UST Removal Action for Concurrence - 12/22/2009

C02NY002506_02.01_0501_a - Review of UST Removal Action Closure Report and Request for Work Plan to Address Exceeded Soil Results - 11/18/2009

C02NY002506_02.01_0502_a - Transmittal of the UST Removal Action Report - 06/26/2009

C02NY002506_02.01_0505_a - Review Timeline for UST Removal and Site Closure Work Plan - 09/19/2008

C02NY002506_02.01_0511_a - Transmittal of the UST Removal and Site Closure Work Plans - 09/26/2008

C02NY002506_02.01_0514_a - Approval of Supplemental Work Plan for Additional Sampling - 12/23/2009

C02NY002506_02.01_0519_a - Transmittal of Attached Supplemental Sampling Report for UST Removal Action and Request for No Further Work Status Approval - 05/21/2010

C02NY002506_02.01_0520_a - Transmittal of Replacement Pages for UST Removal Action Report - 08/13/2009

C02NY002506_02.01_0521_a - Transmittal of Confirmatory Soil Sampling Data Results for UST Removal Action Report - 06/30/2009

C02NY002506_02.01_0525_a - Comments to the Work Plan for UST Removal and Site Closure (with Handwritten Notes) - 10/03/2008

C02NY002506_02.01_0530_a - Transmittal of the Supplemental Sampling Report for NYSDEC Spill No. 08-06523 - 05/21/2010

C02NY002506_02.01_0531_a - Site Conditions Will Not Require Any Further Work at This Time - 05/25/2010

 02.02 Sampling and Analysis Data and Plans
 02.04 Work Plans/Site Safety and Health Plans/Progress Reports

C02NY002504_02.04_0500_a - Interim Removal Action, Component 1 - Phases 2 and 3, Areas A and B, Intermediate Design Analysis Report, Supplement to the 60% Design - 12/--/1998

C02NY002504_02.04_0501_a - Interim Removal Action, Component 1 - Phases 2 and 3, Areas A and B, Draft Permit Application Report and Environmental Compliance Checklist, Supplement to the 60% Design - 12/--/1998

C02NY002504_02.04_0502_a - Final Project Plans - Interim Removal Action, TNT Pipeline and Chemical Waste Sewer Lines - 06/03/1999

C02NY002504_02.04_0504_a - Laboratory Quality Assurance Plans, Interim Removal Action TNT Pipeline and Chemical Waste Sewer Lines - 08/--/1999

C02NY002504_02.04_0512_a - Final Quality Assurance Project Plan, Interim Removal Action, TNT Pipeline and Chemical Waste Sewer Lines - 06/05/2000

C02NY002504_02.04_0514_a - Final Site Safety and Health Plan, Removal Action TNT Pipeline and Chemical Waste Sewer Line, Revision 1 - 06/19/2000

C02NY002504_02.04_0515_a - Contractor Quality Control Plan for Removal of TNT and CWS Pipeline, Revision 1 - 06/23/2000

C02NY002504_02.04_0516_a - Phase I Interim Removal Action, Components 1, 2, and 3, TNT Pipeline and Chemical Waste Sewer, Contract Specifications, Supplement to the 60% Design - 08/--/1998

C02NY002504_02.04_0517_a - Site Operation Plan for Removal of TNT and CWS Pipeline, Revision 2 - 06/28/2000

C02NY002504_02.04_0519_a - Addendum to Ordnance and Explosive Support Services, TNT Pipeline Removal Work Plan - 07/25/2000

C02NY002504_02.04_0520_a - Approved Onsite/Offsite Hazardous Waste Management Plan for the TNT/Chemical Waste Sewer Line Removal - 08/--/2000

C02NY002504_02.04_0521_a - Approved Ordnance and Explosives Support Services TNT Pipeline Removal Work Plan - 08/24/2000

C02NY002504_02.04_0522_a - Approved Inspection of Surface Debris for the Presence of Crystalline TNT - 08/24/2000

C02NY002504_02.04_0527_a - Explosive Safety Submission for Surface Removal of TNT - 11/21/2002

C02NY002504_02.04_0528_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, 30% Preliminary Design, Preliminary Design Analysis Report - 04/--/1997

C02NY002504_02.04_0529_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Draft Long-Term Monitoring Plan, Component Two (Somerset Property), 60% Design Submittal - 09/--/1997

C02NY002504_02.04_0530_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Draft Long-Term Monitoring Plan, Component One (CWM Property), 60 % Design Submittal - 09/--/1997

C02NY002504_02.04_0531_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Intermediate Design Analysis Report, Component Two (Somerset Property), 60% Design Submittal - 09/--/1997

C02NY002504_02.04_0532_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Intermediate Design Analysis Report, Component One (CWM Property), 60% Design Submittal - 09/--/1997

C02NY002504_02.04_0533_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Draft Permit Application Report and Environmental Compliance Checklist, Component Two (Somerset Property), 60% Design Submittal - 09/--/1997

C02NY002504_02.04_0534_a - Remedial Design for Interim Removal Actions, Operable Units 1 and 2, Draft Permit Application Report and Environmental Compliance Checklist, Component One (CWM Property), 60% Design Submittal - 09/--/1997

C02NY002504_02.04_0535_a - Phase I Interim Removal Action, Components 1, 2, and 3, Draft Long-Term Monitoring Plan, Supplement to the 60% Design - 01/--/1998

C02NY002504_02.04_0536_a - Phase I Interim Removal Action, Components 1, 2, and 3, Intermediate Design Analysis Report, Supplement to the 60% Design (Redacted) - 01/--/1998

C02NY002504_02.04_0537_a - Phase I Interim Removal Action, Components 1, 2, and 3, Draft Permit Application Report and Environmental Compliance Checklist, Supplement to the 60% Design - 01/--/1998

C02NY002504_02.04_0538_a - Phases I and II Interim Removal Action, Component 2 - Phases 1 and 2, Final Design Analysis Report, 100% Design - 06/--/1998

C02NY002504_02.04_0539_a - Phases I and II Interim Removal Action, Component 2 - Phases 1 and 2, Final Permit Application Report and Environmental Compliance Checklist, 100% Design - 06/--/1998

C02NY002504_02.04_0544_a - Amendment 1 to the Explosives Safety Submission for a Conventional Munitions and Explosives of Concern (MEC) Response Action - 03/03/2004

C02NY002504_02.04_0548_a - Final Explosive Safety Submission for Removal of Ordnance and Explosives (OE) - 07/02/2001

C02NY002504_02.04_0549_a - Remedial Design of Interim Remedial Measure, Operable Units, 1 and 2, Asbestos Survey Report, Somerset Group Property (Redacted) - 06/--/1998

C02NY002504_02.04_0550_a - Phases I and II Interim Removal Action, Component 2 - Phases 1 and 2, Final Long-Term Monitoring Plan, 100% Design - 06/--/1998

C02NY002504_02.04_0551_a - Phase I Interim Removal Action, Components 1, 2, and 3, TNT Pipeline and Chemical Waste Sewer, Draft Long-Term Monitoring Plan, Supplement to the 60% Design - 08/--/1998

C02NY002504_02.04_0552_a - Interim Removal Action, Component 1 - Phases 2 and 3, Areas A and B, Long-Term Monitoring Plan, Supplement to the 60% Design - 12/--/1998

C02NY002504_02.04_0567_a - Radiation Safety Plan for the TNT Walkover - 04/08/2003

C02NY002504_02.04_0568_a - Final Site Safety and Health Plan Interim Removal Action TNT Pipeline and Chemical Waste Sewer Lines (Redacted) - 06/03/1999

C02NY002504_02.04_0585_a - Submittal of Attached Utility Abandonment Plan (Approved) - 09/29/1999

C02NY002504_02.04_0586_a - Submittal of Attached Methodology for the Waste Water Treatment Plant Demolition (Approved) - 09/08/1999

C02NY002504_02.04_0587_a - Submittal of Attached Pipeline Removal/Backfill Material Specifications (Approved) - 04/21/1999

C02NY002504_02.04_0588_a - Submittal of Attached Asbestos Management, Handling, and Disposal Plan (Approved) - 06/09/1999

C02NY002504_02.04_0590_a - Submittal of Attached Stabilized Construction Entrance/Truck Access Road Details and Associated Documents (Approved) - 04/21/1999

C02NY002504_02.04_0591_a - Submittal of Attached Erosion and Sediment Control Documentation (Approved) - 04/21/1999

C02NY002504_02.04_0593_a - Submittal of Attached Pipeline Abandonment, Sump Construction and Backfill Material  Documentation (Approved) - 04/21/1999

C02NY002504_02.04_0594_a - Submittal of Attached Documentation for Staging Areas and Decontaminated and Contaminated Materials Storage Certifications (Approved) - 04/21/1999

C02NY002504_02.04_0595_a - 100% Final Remedial Design Component 2 - Phase I - 06/--/1997

C02NY002504_02.04_0601_a - 100% Final Remedial Design Component 2 - Phase 2 - 06/--/1997

C02NY002504_02.04_0602_a - Preliminary Remedial Design Investigation, Final Sampling and Analysis Plan and Site Safety and Health Plan (Redacted) - 10/24/1996

C02NY002504_02.04_0603_a - Site Operations Plan and Asbestos Hazard Abatement Plan - 08/12/1998

C02NY002504_02.04_0604_a - Final Plans (Redacted) - 08/--/1998

C02NY002504_02.04_0605_a - Phase I Interim Removal Action Component 2 - Phase I Final Contract Specifications, 100% Design - 06/--/1998

C02NY002504_02.04_0616_a - Remedial Design for Interim Removal Actions Operable Units 1 and 2 Final Work Plan - 10/--/1996

 02.13 Removal Response Reports, Tank Closure Reports/Removal Action Reports

 

C02NY002504_02.13_0500_a - Final Demobilization and Closure Report - 02/02/2000

C02NY002504_02.13_0502_a - Ordnance and Explosive Remediation Project Report Phase One - 08/08/2000

C02NY002504_02.13_0504_a - Ordnance and Explosive Remediation Project Report Second Phase, Emergency Ordnance Explosive Services - 09/13/2000

C02NY002504_02.13_0505_a - After Action Report, Trinitrotoluene Resizing Operation, January 22-26, 2001 - 03/30/2001

C02NY002504_02.13_0509_a - Final Report for Surface Removal of TNT - 10/01/2003

C02NY002504_02.13_0511_a - After Action Report for Walkover and Surface Removal of TNT, Revision 2 - 06/--/2004

C02NY002504_02.13_0512_a - Project Completion Report for CMSA Pad Removal - 07/--/2005

C02NY002504_02.13_0514_a - TNT Burn 1 Summary Report - --/--/----

C02NY002504_02.13_0515_a - Test Point No. 11, TNT Pipeline Removal Final Report - --/--/----

C02NY002504_02.13_0524_a - TNT Pipeline Removal Final Closeout Report - --/--/----

C02NY002504_02.13_0525_a - After Action Report UXO Activities at the Waste Water Treatment Plant - 06/--/2004

C02NY002504_02.13_0529_a - Health and Safety Monitoring Report TNT Investigation at the Waste Water Treatment Plant - 06/21/2004

C02NY002504_02.13_0530_a - After Action Report - UXO Activities at the Waste Water Treatment Plant - Revision 2 2003 - 06/--/2004

C02NY002504_02.13_0532_a - Final Asbestos Containing Material (ACM) Removal Summary (Redacted) - 06/--/2001

C02NY002504_02.13_0533_a - Remedial Design for Interim Removal Actions Operable Units 1 and 2 Preliminary Remedial Design Investigation (PRDI) Report - 05/--/1997

C02NY002504_02.13_0534_a - Cleanup of Asbestos-Containing Materials Somerset Group Property Remedial Activities Final Report Volume II - 06/--/2000

C02NY002504_02.13_0535_a - Cleanup of Asbestos-Containing Materials Somerset Group Property Remediation Activities Final Report Volume 1 - 06/--/2000

C02NY002504_02.13_0536_a - Remediation Activities Final Report - 03/--/1999

C02NY002510_02.13_0500_a.pdf - Report Re: Completion Report for Mitigation of Safety Hazards at the LOOW Office of Economic Adjustment Wastewater Treatment Plant

 02.16 Engineering Evaluation/Cost Analysis
 02.20 Corrective Action Plans/Tank or Other Removal Workplans
 02.22 Tank Closure Reports/Removal Action Reports

03 Remedial Investigation

Collapse All Expand All
 03.01 Correspondence
 03.04 Work Plans/Site Safety and Health Plans/Progress Reports

C02NY002501_03.04_0019_a.pdf - Report Re: Final Groundwater Monitoring Well Decommissioning Work Plan

C02NY002501_03.04_0020_a.pdf - Report Re: Final Site Safety and Health Plan Addendum No. 2 for Monitoring Well Decommissioning (Without Appendices)

C02NY002511_03.04_0500_a.pdf - Memorandum Re: Technical Memorandum No. 1 - Occidental Chemical Corporation Property - Human Health Risk Assessment Work Plan Addendum

C02NY002511_03.04_0501_a.pdf - Memorandum Re: Technical Memorandum No. 2 - Occidental Chemical Corporation Property - Screening-Level Ecological Risk Assessment Work Plan Addendum

C02NY002511_03.04_0502_a - Final Field Sampling Plan Addendum for Occidental Chemical Corporation Property Data Gap and Lewiston-Porter Central School District Investigations - 08/--/2010

C02NY002511_03.04_0503_a - Final Quality Assurance Project Plan Addendum for Occidental Chemical Corporation Property Data Gap and Lewiston-Porter Central School District Investigations - 08/--/2010

C02NY002511_03.04_0504_a - Final Site Safety and Health Plan Addendum for Occidental Chemical Corporation Property Data Gap and Lewiston-Porter Central School District Investigations - 08/--/2010

C02NY002511_03.04_0505_a - Notes for Analytical Data Tables and Figure for Occidental Property Investigation in 2010 - --/--/2010

C02NY002511_03.04_0506_a - Final Field Sampling Plan Addendum for Occidental Chemical Corporation Property and Wastewater Treatment Plant Data Gap Investigations - 08/--/2011

C02NY002511_03.04_0507_a - Final Quality Assurance Project Plan Addendum for Occidental Chemical Corporation Property and Wastewater Treatment Plant Data Gap Investigations - 08/--/2011

C02NY002511_03.04_0508_a - Final Site Safety and Health Plan Addendum for Occidental Chemical Corporation Property and Wastewater Treatment Plant Data Gap Investigations - 08/--/2011

 03.10 Remedial Investigation (RI) Reports and other final RI-related reports

05. Record of Decision (ROD)/Decision Document (DD)

08 Public Affairs-Community Relations

Collapse All Expand All
 08.01 Correspondence

C02NY0025--_08.01_1241_a.pdf - E-mail Re: Receipt of Information Omitted from Record of Subsequent Use of Portions of the Site to Be Added to the Administrative Record

C02NY0025--_08.01_1243_a.pdf - Letter Re: Notification of the Availability of the Management Action Plan and Associated Property Management Action Plans, Update No. 1

C02NY0025--_08.01_1244_a.pdf - Letter Re: Notification of the Availability of the Management Action Plan and Associated Property Management Action Plans, Update No. 1

C02NY0025--_08.01_1245_a.pdf - Letter Re: Notification of the Availability of the Management Action Plan and Associated Property Management Action Plans, Update No. 1

C02NY002501_08.01_0009_a.pdf - Letter Re: Transmittal of the Groundwater Monitoring Well Decommissioning Completion Report

C02NY002501_08.01_0010_a.pdf - Letter Re: Transmittal of the Groundwater Monitoring Well Decommissioning Completion Report

C02NY002511_08.01_0500_a.pdf - E-mail Re: Lake Ontario Ordnance WOrks News from the Corps

C02NY002511_08.01_0504_a.pdf - Letter Re: Notification of Approval of Resolution 2017-01 for the Public Record

C02NY002511_08.01_0505_a.pdf - Letter Re: Notification That Removed Material from Site May Not Cross Tuscarora Nation Territory

C02NY002504_08.01_0010_a - Concurrence with Additional Burn Permits or TNT Disposal - 08/15/2000

C02NY002504_08.01_0011_a - Notification of Additional Underground TNT Lines Located South of SLF 7 and West of Stabilization Facility - 06/10/1991

C02NY002504_08.01_0014_a - Response to Concerns Regarding the Contractor (Redacted) - 09/30/1998

C02NY002504_08.01_0017_a - Transmittal of Proposal to Complete Corrective Actions for Review - 07/16/1999

C02NY002504_08.01_0018_a - Follow up to Concerns Regarding Damages Caused by the Contractor - --/--/----

C02NY002504_08.01_0023_a - Questions and Issues Regarding Chemical Waste Sewer Removal near the Acid Neutralization Lagoon and Oil Water Separator - 07/20/2000

C02NY002504_08.01_0024_a - Transmittal of Attached Requested Permit Limits, Levels, and Monitoring Information - 07/20/2000

C02NY002504_08.01_0025_a - Legal Complaints Regarding Asbestos Remediation at the Somerset Property - 10/14/1999

C02NY002504_08.01_0026_a - Comments to the October 21, 1999 USACE Letter  Regarding Corrective Actions Related to Damage Claims - 10/27/1999

C02NY002504_08.01_0027_a - Response to Concerns from Three Letters Regarding Interim Removal Efforts - 11/16/1999

C02NY002504_08.01_0033_a - Notification That There Will Be No Costs to the Town of Lewiston Associated with the Demolition of the Former Wastewater Treatment Plant - 09/28/1999

C02NY002504_08.01_0034_a - Transmittal of Letter Proposing Settlement of Claims and Right-of-Entry for Review - 10/21/1999

C02NY002504_08.01_0036_a - Response to July 16, 1999 Letter Indicating the Proposal for Addressing Damage to Property is Inadequate and Request to Reconsider - 08/05/1999

C02NY002504_08.01_0047_a - Transmittal of Data and E-mails between USACE and NYSDEC Regarding Disposal of the Contaminated Materials Storage Area Pad for Review - 01/04/2005

C02NY002504_08.01_0048_a - Confirmation of TNT within the Contaminated Materials Storage Area and Direction Not to Enter Area - 09/12/2003

C02NY002504_08.01_0049_a - Confirmation of Approval to Issue a Burning Permit (Redacted) - 08/03/2000

C02NY002504_08.01_0053_a - Notification of Burn Pit Located with Debris and Request for Direction on Options for Disposal - 07/27/1994

C02NY002504_08.01_0054_a - Notification of Availability of the Engineering Evaluation/Cost Analysis for Interim Removal Action and Public Comment - 09/08/2000

C02NY002504_08.01_0055_a - Transmittal of CMSA Pad Removal Fact Sheet and Health and Safety Plan for Review - 02/23/2005

C02NY002504_08.01_0056_a - Transmittal of the 30% Preliminary Design for the Preliminary Remedial Design Report and Appendices for Review - 04/16/1997

C02NY002504_08.01_0057_a - Transmittal of the Supplement to the 60% Intermediate Design and Update of Design Status - 01/16/1998

C02NY002504_08.01_0062_a - Explanation and Assessment of Damages Claim Related to Asbestos Removal Work - 05/03/2000

C02NY002504_08.01_0063_a - Transmittal of Attached Generator Waste Characterization Report for Asbestos Containing Material Removed from the Site - --/--/----

C02NY002504_08.01_0066_a - Transmittal of Attached Historical CWM Field Notes and Select Analytical Results for Samples Collected at Model City Facility - 04/10/1998

C02NY002506_08.01_0500_a - News from the Corps: Upcoming Activities to Address the Underground Storage Tank Project - 05/30/2008

C02NY002506_08.01_0501_a - Follow Up to Request to Review Plans, Designs, and Specifications Regarding the Removal of Wastewater Tanks and Monitoring Procedures - 08/13/2008

C02NY002506_08.01_0503_a - Transmittal of UST Removal Scope of Work - 08/26/2008

C02NY002511_08.01_0500_a - Lake Ontario Ordnance WOrks News from the Corps - 08/06/2015

C02NY002511_08.01_0501_a - Update to Proposed Environmental Sampling of School Property and Request for Meeting - 02/26/2010

C02NY002511_08.01_0502_a - Transmittal of Attached Aerial Photos and Waste Disposal Information regarding Lewiston-Porter Campus - 07/22/2011

C02NY002511_08.01_0504_a - Notification of Approval of Resolution 2017-01 for the Public Record - 02/01/2017

C02NY002511_08.01_0505_a - Notification That Removed Material from Site May Not Cross Tuscarora Nation Territory - 01/28/2017

 08.06 Community Relations Plans
 08.08 News Clippings and Press Releases
 08.10 Public Meeting Minutes/Transcripts/Restoration Advisory Board (RAB) and Technical Review Committee (TRC)
 08.11 Fact Sheets/Newsletters

C02NY0025--_08.11_0655_a.pdf - Fact Sheet Re: Management Action Plan Fact Sheet

C02NY0025--_08.11_0656_a.pdf - Fact Sheet Re: Lake Ontario Ordnance Works Current Status of Projects Fact Sheet

C02NY0025--_08.11_0657_a.pdf - Fact Sheet Re: Lake Ontario Ordnance Works Current Status of Projects Fact Sheet

C02NY0025--_08.11_0658_a.pdf - Fact Sheet Re: 2013 Management Action Plan, Update 1 Fact Sheet

C02NY002504_08.11_0011_a - Description, Project Description, Status, and Project Cost for Interim Cleanup Actions with Attached Maps - 08/--/1997

C02NY002504_08.11_0012_a - Contaminated Material Storage Area (CMSA) Pad - 05/--/2005

C02NY002504_08.11_0014_a - Background Information and Investigations Addressing the Waste Water Treatment Plant (WWTP) - 09/--/2002

C02NY002504_08.11_0015_a - Asbestos Remediation Photographs and Fact Sheet - 12/--/1998

C02NY002506_08.11_0500_a - Location, Project Description, Purpose, and Site History for the UST Removal Project - 07/--/2008

C02NY002510_08.11_0500_a.pdf - Fact Sheet Re: LOOW Wastewater Treatment Plant Feasibility Study Fact Sheet

C02NY002510_08.11_0501_a.pdf - Fact Sheet Re: LOOW Wastewater Treatment Plant Feasibility Study Fact Sheet

C02NY002511_08.11_0500_a.pdf - Fact Sheet Re: LOOW Exposure Unit 8- Occidental Chemical Company Feasibility Fact Sheet

C02NY002511_08.11_0501_a.pdf - Fact Sheet Re: LOOW Exposure Unit 8 - Occidental Chemical Company Revised Feasibility Fact Sheet

C02NY002511_08.11_0502_a.pdf - Fact Sheet Re: Exposure Unit 8 - Occidental Chemical Company Feasibility Study Fact Sheet

C02NY002511_08.11_0503_a.pdf - Fact Sheet Re: Occidental Chemical Company Proposed Plan Fact Sheet

C02NY002511_08.11_0504_a.pdf - Fact Sheet Re: Occidental Chemical Company Remedial Investigation Fact Sheet

C02NY002512_08.11_0500_a.pdf - Fact Sheet Re: Site Inspection Report Fact Sheet

 08.12 Written Responses to Public Comments/Questions
 08.13 Public Notices

C02NY0025--_08.13_0573_a.pdf - News Article Re: Buffalo News: FS EU8 Occidental Chemical Property Former Lake Ontario Ordnance Works (LOOW) Formerly Used Defense Site

C02NY0025--_08.13_0574_a.pdf - Notice Re: You are invited Lake Ontario Ordnance Works Poster Session - Lewiston Porter Sentinel

C02NY0025--_08.13_0580_a.pdf - Notice Re: Announcement of the Availability of the Management Action Plan and Associated Property Management Action Plans, Update No. 1

C02NY0025--_08.13_0581_a.pdf - Notice Re: Announcement of the Availability of the Management Action Plan and Associated Property Management Action Plans, Update No. 2

C02NY002501_08.13_0009_a.pdf - Notice Re: Notification of Availability of the Monitoring Well Decommissioning Work Plan

C02NY002504_08.13_0009_a - Notice of Public Availability Announcing the Availability of an Administrative Record for a Removal Action - --/--/----

C02NY002504_08.13_0010_a - Invitation of Public Review on the Removal Action Decision Document - --/--/----

C02NY002504_08.13_0011_a - Engineering Evaluation/Cost Analysis and Administrative Record File for the Former Lake Ontario Ordnance Works Site Released for Formal Comment September 11, 2000 through October 10, 2000 - --/--/----

C02NY002510_08.13_0500_a.pdf - Press Release/Public Notice Re: Announcement That Mitigation of Public Safety Hazards is Complete

C02NY002511_08.13_0501_a.pdf - News Article Re: Buffalo News: FS EU8 Occidental Chemical Property Former Lake Ontario Ordnance Works (LOOW) Formerly Used Defense Site

C02NY002511_08.13_0502_a.pdf - Notice Re: Town of Lewiston Resolution 2017-3 for Recommendation of Alternative 4

C02NY002511_08.13_0503_a.pdf - Notice Re: Town of Lewiston Environmental Commission Resolution 2017-01 for Recommendation of Alternative 4

C02NY002511_08.13_0504_a.pdf - Press Release/Public Notice Re: Notice of the Availability of the Remedial Investigation Report

C02NY002511_08.13_0505_a.pdf - Press Release/Public Notice Re: Notice of the Availability of the Presentation and Posters for the January 11, 2017 Public Meeting

C02NY002511_08.13_0506_a.pdf - Press Release/Public Notice Re: Notice of the Availability of the Proposed Plan for Public Review

C02NY002511_08.13_0507_a.pdf - Press Release/Public Notice Re: Notice of the Availability of the Proposed Plan and Scheduled Public Meeting

C02NY002512_08.13_0500_a.pdf - Notice Re: Site Inspection Report Ground Disturbances at the Former Lake Ontario Ordnance Works FUDS

C02NY002512_08.13_0501_a.pdf - Notice Re: Site Inspection Report Ground Disturbances at the Former Lake Ontario Ordnance WOrks FUDS

C02NY002512_08.13_0502_a.pdf - Notice Re: Site Inspection Report Ground Disturbances at the Former Lake ONtario Ordnance Works FUDS- Lewiston Porter Sentinel

 08.17 RAB Assessments (Including MFRs & Surveys)