Sandbag and Sand Estimation Worksheet
Individual Homes:
1. Bagging foundation opening, per house (250 to 500 each)
Estimated Number of Homes: _____________
Estimated Bags per Home (x) _____________
2. Protection of groups of buildings with Levees and Dikes (per linear foot of dike/levee)
| Height Required |
Number of Sandbags |
| 1 Foot |
8 |
| 2 Feet |
20 |
| 3 Feet |
34 |
| 1 Ton of Sand |
50 Sandbags |
Estimated Linear Feet of Dike/Levee: _______________
Bags for Height per Linear Foot : (x) ________________
3. Sand Estimate (@ approximately 40lbs per bag)
Grand Total number of Bags (above): _______________ (divide this number by 50)
Equals the number of tons of sand : _________________
(i.e. 2000 sandbags requires 40 tons of sand)
|