Debris removal at Mount Morris Dam underway
This year $300,000 will be used to remove approximately 3,200 cubic yards of floatable material, to include trees, tires, and other material that has floated down the Genesee River, and approximately 9,000 cubic yards of sediment from behind the dam.

Download Image: Full Size (1.74 MB)
Photo by: Andrew Kornacki |  VIRIN: 150813-A-IF251-028.JPG