The administrative record file is a collection of documents that form the basis for the selection of a response action at an environmental restoration site. Under the Comprehensive Environmental Response, Compensation, and Liability Act, the U.S. Army Corps of Engineers is required to establish an administrative record for every remedial or response action under the Formerly Utilized Sites Remedial Action Program (FUSRAP).

The documents included in the Guterl Steel Site administrative record file are arranged by subject code and are identified with unique numbers to assist in tracking and retrieval of the documents.

The index to the administrative record file is linked below.

Index of the Administrative Record File for the Guterl Steel Site

01 Site Management Records

Collapse All Expand All
  • Guterl_01.01_0008_a.pdf - Letter Re: Invitation to Attend the December 12, 2000 FUSRAP Guterl Specialty Steel Corporation Information Session - November 28, 2000
  • Guterl_01.01_0010_a.pdf - Letter Re: USEPA Offer to Work with USACE on Remedial Activities at Site - December 12, 2000
  • Guterl_01.01_0013_a.pdf - Letter Re: Transmittal of USEPA Comments on the Draft Preliminary Assessment - March 30, 2001
  • Guterl_01.01_0015_a.pdf - NSYDEC Comments on the Combined Preliminary Assessment/Site Inspection Report (March 1,2001 Draft) - April 9, 2001
  • Guterl_01.01_0031_a.pdf - Review Comments on the Combined Preliminary Assessment / Site Inspection Report (March 1, 2001 Draft) - Unknown
  • Guterl_01.01_0032_a.pdf - Review Comments on the Combined Preliminary Assessment / Site Inspection Report (March 1, 2001 Draft) - Unknown
  • Guterl_01.06_0010_a.pdf - Final Report - Radiological Survey of the Former Simonds Saw and Steel Company - September 1978
  • Guterl_01.06_0011_a.pdf - Final Radiological Survey of the Former Simonds Saw and Steel Co. - November 1979
  • Guterl_01.06_0017_a.pdf - Final Preliminary Engineering and Environmental Evaluation of the Remedial Action Alternatives for the Former Simonds Saw and Steel Company Site - November 1981
  • Guterl_01.06_0018_a.pdf - Letter Re: Discussion of DOE Determination that DOE does not have the Authority to Conduct Remedial Action at the Site - December 20, 1984
  • Guterl_01.06_0019_a.pdf - Letter Re: Discussion of DOE Determination that Site will not be Remediated under the Atomic Energy Act - December 20, 1984
  • Guterl_01.06_0023_a.pdf - Letter Re: US EPA Evaluation of the Simonds Site for Possible Inclusion on the National Priorities List - June 6, 1986
  • Guterl_01.06_0024_a.pdf - Letter Re: USDOE will not Revise the Determination for Remedial Action at Site - August 1, 1986
  • Guterl_01.06_0029_a.pdf - Preliminary Site Assessment Evaluation Report of Initial Data - Volume I - April 1994
  • Guterl_01.06_0030_a.pdf - Preliminary Site Assessment Evaluation Report of Initial Data - Volume II Supporting Documentation - April 1994
  • Guterl_01.06_0036_a.pdf - Letter Re: Transmittal of Summary of Gamma Survey and Gamma Spectrometry Results - October 8, 1999
  • Guterl_01.06_0037_a.pdf - Radiological Survey of the Guterl Specialty Steel Corporation - December 1999
  • Guterl_01.06_0040_a.pdf - Summary of Gamma Survey and Gamma Spectrometry Results - October 27, 2000
  • Guterl_01.06_0041_a.pdf - NYSDEC Immediate Investigative Work Assignment Report - Guterl Excised Area - October 2000
  • Guterl_01.06_0045_a.pdf - Reference Document: Guide to Radionuclides - January 2001
  • Guterl_01.06_0048_a.pdf - Reference Document: Site Profile for Simonds Saw and Steel - May 31, 2005
  • Guterl_01.06_0052_a.pdf - Responses to Review Comments on the Draft Work Plan - August 2006
  • Guterl_01.06_0057_a.pdf - Reference Document: Radiation and Health - Unknown
  • Guterl_01.07_0001_a.pdf - Letter Re: Canal Permit Application Use of Canal Lands and surface Waters for Sediment and Surface Water Column Sampling - September 5, 2007
  • Guterl_01.07_0002_a.pdf - Letter Re: Approved Canal Work Permit # C4W070055 Use of Canal Lands for Sediment and Water Column Sampling - September 10, 2007
  • Guterl_01.07_0003_a.pdf - Form: Certificate of Release: Container Number MHFU 002367 - January 7, 2008
  • Guterl_01.07_0004_a.pdf - Form: Certificate of Disposal of Drummed Non Industrial - Non RCRA Waste - April 30, 2008
  • Guterl_01.07_0005_a.pdf - Form: Shipment of Non-RCRA, Non-DOT Regulated Material (IDW Purge Water) - Unknown
  • Guterl_01.08_0001_a.pdf - Letter Re: Guterl Steel Site FUSRAP Eligibility Letter - May 19, 2000
  • Guterl_01.08_0002_a.pdf - Memo Re: Recommendation to Include the Guterl Site in FUSRAP - April 30, 2001
  • Guterl_01.09_0002_a.pdf - Preliminary Assessment / Site Inspection Report - April 13, 2001
  • Guterl_01.09_0004_a.pdf - Preliminary Assessment / Site Inspection Former Guterl Specialty Steel Corporation - April 13, 2001
  • Guterl_01.14_0002_a.pdf - Site Safety and Health Plan for Site Visits - March 2006

03 Remedial Investigation

Collapse All Expand All
  • Guterl_03.01_0001_a.pdf - Letter Re: Invitation to Attend the February 6, 2001 FUSRAP Guterl Specialty Steel Corporation Information Session - January 19, 2001
  • Guterl_03.01_0014_a.pdf - E-mail Re: Notice that NYSDEC is Initiating the RI/FS Work and Request to Coordinate Sampling Efforts - November 28, 2005
  • Guterl_03.01_0024_a.pdf - Letter Re: Submittal of the Data Gap Analysis Report, Site Safety and Health Plan, and the Gamma Walkover Survey for the Remedial Investigation - July 13, 2006
  • Guterl_03.01_0026_a.pdf - Letter Re: Transmittal of the Draft Final Remedial Investigation/Feasibility Study Work Plan for the Former Landfill and Excise Areas - September 15, 2006
  • Guterl_03.01_0035_a.pdf - Letter Re: Transmittal of the Field Sampling Plan and the Quality Assurance Plan for the Remedial Investigation - January 23, 2007
  • Guterl_03.01_0041_a.pdf - Letter Re: Transmittal of Newsletter Pertaining to the Remedial Investigation at Site - June 18, 2007
  • Guterl_03.01_0073_a.pdf - Letter Re: Guterl Remedial Investigation Report Release letter to Stakeholders - August 19, 2010
  • Guterl_03.01_0074_a.pdf - Letter Re: Guterl Remedial Investigation Report: Release Letter To Elected Officials - August 19, 2010
  • Guterl_03.01_0075_a.pdf - Letter Re: Guterl Remedial Investigation Report Release Letter to Interested Citizen - August 20, 2010
  • Guterl_03.01_0076_a.pdf - E-mail Re: Guterl (Simonds Saw and Steel) Public Information Session Meeting 06 OCT - August 23, 2010
  • Guterl_03.02_0003_a.pdf - Summary of Historical Analytical Data - June 2005
  • Guterl_03.02_0005_a.pdf - Final Sampling and Analysis Plan Volume 1 - Field Sampling Plan - November 2006
  • Guterl_03.02_0006_a.pdf - Final Sampling and Analysis Plan Volume 2 - Quality Assurance Project Plan - November 2006
  • Guterl_03.02_0007_a.pdf - Final Sampling and Analysis Plan Volume 1 - Field Sampling Plan - Revision 1 - January 2007
  • Guterl_03.02_0008_a.pdf - Final Sampling and Analysis Plan Volume 2 - Quality Assurance Project Plan - Revision 1 - January 2007
  • Guterl_03.02_0009_a.pdf - Final Sampling and Analysis Plan, Volume 1 - Field Sampling Plan - Revised - June 14, 2007
  • Guterl_03.02_0010_a.pdf - Final Sampling and Analysis Plan, Volume 2 - Quality Assurance Project Plan - Revised - June 14, 2007
  • Guterl_03.02_0076_a.pdf - Summary of Historical Analytical Data for the Guterl Steel FUSRAP Site, Lockport New York - Unknown
  • Guterl_03.04_0005_a.pdf - Final - Engineering and Design Quality Control Plan - Data Review, Data Gap Analysis, Acquisition of Field Data, and Remedial Investigation - July 6, 2005
  • Guterl_03.04_0014_a.pdf - Site Safety and Health Plan for Structural Inspection - January 27, 2006
  • Guterl_03.04_0017_a.pdf - Final Gamma Walkover Survey Plan - June 2006
  • Guterl_03.04_0018_a.pdf - Final Site Safety and Health Plan - June 2006
  • Guterl_03.04_0022_a.pdf - Final Site Safety and Health Plan - June 14, 2007
  • Guterl_03.07_0002_a.pdf - Final Preliminary Identification of Data Quality Objectives (DQOs) and Applicable or Relevant and Appropriate Requirements (ARARs) - September 2005
  • Guterl_03.10_0001_a.pdf - Final Data Gap Analysis Report (DGAR) - December 23, 2005
  • Guterl_03.10_0002_a.pdf - Final Data Gap Analysis Report (DGAR) - Revision 1 - March 2006
  • Guterl_03.10_0003_a.pdf - Final Report - Examination of Historical Photography - September 2009
  • Guterl_03.10_0004_a.pdf - Remedial Investigation Report - July 2010
  • Guterl_03.12_0002_a.pdf - Meeting Documents Re: Goals and Agenda for the Technical Project Planning Meeting for the Remedial Investigation Phase - August 9-10, 2005 - August 9, 2005
  • Guterl_03.12_0003_a.pdf - Meeting Documents Re: Technical Project Planning Meeting for the Remedial Investigation Phase August 9 - 10, 2005 - August 10, 2005
  • Guterl_03.12_0004_a.pdf - Presentation: Technical Project Planning Session - August 2005
  • Guterl_03.12_0005_a.pdf - Meeting Documents Re: Technical Project Planning Meeting for the Remedial Investigation Phase - Meeting Minutes August 9-10, 2005 - September 1, 2005

04 Feasibility Study (FS)

Collapse All Expand All
  • Guterl_04.01_0001_a.pdf - Letter Re: Niagara County Residents Letter re Well Survey - April 30, 2012
  • Guterl_04.01_0002_a.pdf - Letter Re: Sewer Sampling Resutls as part of the current Data Gap Investigation for the Former Guterl Specilaty Steel Corporation, City of Lockport, NY - April 17, 2012
  • Guterl_04.01_0003_a.pdf - Letter Re: Letter: Guterl Steel ARAR's from NYS Department of Environmental Conservation - May 15, 2014
  • Guterl_04.02_0001_a.pdf - Data/Spreadsheet/Table Re: Supplemental Sampling and Technical Memorandum Former Guterl Specialty Steel Coporation Site; Lockport, NY - Unknown
  • Guterl_04.02_0002_a.pdf - Supplemental Sampling and Technical Memorandum Appendecies; Former Guterl Specialty Steel Corporation, Lockport, New York
  • Supplemental Sampling and Technical Memorandum Appendecies Former Guterl Specialty Steel Coporation Site; Lockport, NY - July 26, 2013
  • Guterl_04.04_0001_a.pdf - Engineering and Design Quality Control Plan - Data Gap Analysis and Report, Numerical Groundwater Model, and Feasibility Study (Revision 1) - October 22, 2010
  • Guterl_04.11_0002_a.pdf - Presentation: Technical Project Planning Meeting - December 7, 2010
  • Guterl_04.11_0003_a.pdf - Meeting Documents Re: Technical Project Planning Meeting Agenda and Sign-in Sheet - December 7, 2010
  • Guterl_04.11_0004_a.pdf - Letter Re: Guterl Feasibility Study Technical Project Planning Meeting Agenda - December 7, 2010

08 Public Affairs-Community Relations

Collapse All Expand All
  • Guterl_08.01_0002_a.pdf - Letter Re: Notice to Contact the U.S. Department of Energy with any Health Related Concerns - October 20, 2000
  • Guterl_08.01_0003_a.pdf - Guterl Site Call Log - October 2000
  • Guterl_08.01_0004_a.pdf - Buffalo District Community Interaction Log - November 16, 2000
  • Guterl_08.01_0005_a.pdf - Letter Re: Invitation to Attend the December 12, 2000 FUSRAP Guterl Specialty Steel Corporation Information Session - November 28, 2000
  • Guterl_08.01_0006_a.pdf - E-mail Re: Request for Any Previous Assessments/Reports at Site and Request to be Added to Site Mailing List - January 8, 2001
  • Guterl_08.01_0007_a.pdf - Letter Re: Invitation to Attend the February 6, 2001 FUSRAP Guterl Specialty Steel Corporation Information Session - January 19, 2001
  • Guterl_08.01_0008_a.pdf - Letter Re: Invitation to Attend the February 6, 2001 FUSRAP Guterl Specialty Steel Corporation Information Session - January 19, 2001
  • Guterl_08.01_0009_a.pdf - Letter Re: Invitation to Attend the February 6, 2001 FUSRAP Guterl Specialty Steel Corporation Information Session - January 19, 2001
  • Guterl_08.01_0010_a.pdf - Letter Re: Invitation to Attend the February 6, 2001 FUSRAP Guterl Specialty Steel Corporation Information Session - January 19, 2001
  • Guterl_08.01_0011_a.pdf - E-mail Re: Request to be Added to Site Mailing List - February 1, 2001
  • Guterl_08.01_0012_a.pdf - E-mail Re: Request to be Added to Site Mailing List - February 1, 2001
  • Guterl_08.01_0013_a.pdf - E-mail Re: Request for Article Outlined in the Buffalo News - February 2, 2001
  • Guterl_08.01_0014_a.pdf - E-mail Re: Dates of Employment at Simonds Saw and Steel Co. and Request for Information - February 2, 2001
  • Guterl_08.01_0015_a.pdf - E-mail Re: Request to be Added to Site Mailing List - February 2, 2001
  • Guterl_08.01_0016_a.pdf - E-mail Re: Request to be Added to Site Mailing List - February 3, 2001
  • Guterl_08.01_0017_a.pdf - E-mail Re: Request to be Added to Site Mailing List - February 5, 2001
  • Guterl_08.01_0019_a.pdf - Buffalo District Community Interaction Log - Guterl Calls 10/30/2000 - 2/5/2001 - February 16, 2001
  • Guterl_08.01_0020_a.pdf - E-mail Re: Dates of Employment at Simonds Saw and Steel Co. and Request for Information - February 26, 2001
  • Guterl_08.01_0021_a.pdf - Letter Re: Transmittal of Various Fact Sheets and the Presentation Given at the February 6, 2001 USACE Meeting - February 2001
  • Guterl_08.01_0022_a.pdf - Interview of Roger Flick, Former Employee of Simonds Saw & Steel - March 5, 2001
  • Guterl_08.01_0023_a.pdf - E-mail Re: Notice of John Simon's Absence from the USACE Meeting - March 9, 2001
  • Guterl_08.01_0024_a.pdf - Letter Re: Notice to Contact the New York State Department of Health for Health Issues Related to Work at Guterl Site - March 23, 2001
  • Guterl_08.01_0025_a.pdf - Letter Re: Letter of Appreciation for Participating in the Simonds Saw & Steel Interview - April 26, 2001
  • Guterl_08.01_0026_a.pdf - Letter Re: Update on the Status of the Preliminary Assessment at Site - May 21, 2001
  • Guterl_08.01_0027_a.pdf - E-mail Re: Request for Update on the Preliminary Assessment - December 29, 2001
  • Guterl_08.01_0028_a.pdf - E-mail Re: Request for the Radiological Survey Conducted at Site - May 3, 2002
  • Guterl_08.01_0029_a.pdf - Letter Re: Request for Update on Efforts on Health Concerns of Former Employees - March 31, 2003
  • Guterl_08.01_0031_a.pdf - Letter Re: Update on the Preliminary Legal Analysis of the Guterl Site - September 11, 2003
  • Guterl_08.01_0032_a.pdf - E-mail Re: Dates of Employment at Simonds Saw and Steel Co. and Request for Health Compensation Information - December 8, 2003
  • Guterl_08.01_0033_a.pdf - E-mail Re: Transmittal of Pictures of the Site Fence and Request for Funding to Maintenance of Fence - March 30, 2004
  • Guterl_08.01_0037_a.pdf - Letter Re: Statement that Barrels of Toxic Waste were Buried Behind the Simonds Saw Site - June 27, 2007
  • Guterl_08.01_0042_a.pdf - Letter Re: Request to be Added to Mailing List for Site Updates - April 25, 2008
  • Guterl_08.01_0043_a.pdf - Letter Re: Request to be Added to Mailing List for Site Updates - May 14, 2008
  • Guterl_08.01_0044_a.pdf - Interview of Frank Epp, Former Employee of Simonds Saw & Steel - Unknown
  • Guterl_08.01_0045_a.pdf - Letter Re: Transmittal of Newsletter that Presents Information on the Remedial Investigation - June 18, 2007
  • Guterl_08.01_0046_a.pdf - E-mail Re: Public Inquiry - Guterl - September 19, 2011
  • Guterl_08.01_0047_a.pdf - E-mail Re: Guterl Investigation, Lockport NY - April 18, 2011
  • Guterl_08.01_0048_a.pdf - E-mail Re: Nelson E-mail re Guterl Investigation Oct 2011 - October 25, 2011
  • Guterl_08.01_0049_a.pdf - Form: Nemi Comment Card Dec 2010 - December 16, 2010
  • Guterl_08.01_0050_a.pdf - E-mail Re: NYDOH email re comments to Data Gap Investigation fact sheet - April 20, 2012
  • Guterl_08.01_0051_a.pdf - Memo Re: Legal Certification- Former Guterl Specialty Steel Site Remedial Investigation Report - July 14, 2010
  • Guterl_08.01_0052_a.pdf - Fact Sheet/Newsletter Re: FUSRAP Stakeholder Report December 2011 - Unknown
  • Guterl_08.01_0053_a.pdf - Fact Sheet/Newsletter Re: FUSRAP Program Update October 2011 - Unknown
  • Guterl_08.01_0054_a.pdf - Letter Re: NCDOH Guterl Letter Re 501 Ohio Street - April 30, 2012
  • Guterl_08.01_0055_a.pdf - E-mail Re: USACE Email Antoncich re Guterl Newsletter with Newsletter attached - June 8, 2012
  • Guterl_08.01_0056_a.pdf - E-mail Re: Email Re Guterl Specialty Steel, Lockport, NY 14094 - August 24, 2010
  • Guterl_08.01_0057_a.pdf - E-mail Re: Email RE: Former Guterl Specialty Steel Site Data Gap Inv. Fact Sheet and 2011 Groundwater Report - April 19, 2012
  • Guterl_08.01_0058_a.pdf - E-mail Re: RE: Mailing address corrections, etc. - September 23, 2010
  • Guterl_08.01_0059_a.pdf - E-mail Re: RE: Guterl Steel FUSRAP Appendices - January 05, 2011
  • Guterl_08.01_0060_a.pdf - Letter Re: Technical Planning Project Meeting – Former Guterl Steel Site, Lockport, NY - November 23, 2010
  • Guterl_08.01_0061_a.pdf - Letter Re: Annual Environmental Monitoring Program Results for the Former Guterl Specialty Steel Site, Lockport, New York - May 29, 2015
  • Guterl_08.06_0001_a.pdf - Community Involvement Plan - May 29, 2007
  • Guterl_08.06_0002_a.pdf - Community Relations Plan Guterl Specialty Steel Corporation FUSRAP Site April 2015 - Unknown
  • Guterl_08.08_0001_a.pdf - Press Release/Public Notice Re: Guterl Reopening Suffers a Setback: Delay Attributed to Plant's Radiation Levels - June 21, 1984
  • Guterl_08.08_0002_a.pdf - Article Re: Guterl Deal May Close Soon - August 1, 1984
  • Guterl_08.08_0003_a.pdf - Article Re: Radiation Exposure Site List Raises Questions - January 13, 2000
  • Guterl_08.08_0004_a.pdf - Article Re: Corps of Engineers to Add Simonds Site to Cleanup Plan - September 1, 2000
  • Guterl_08.08_0005_a.pdf - Article Re: Simonds Recalled - September 6, 2000
  • Guterl_08.08_0006_a.pdf - Article Re: Revisiting a Deadly Atomic History - September 7, 2000
  • Guterl_08.08_0007_a.pdf - Article Re: Articles Probe Messy Legacy of Production - September 8, 2000
  • Guterl_08.08_0008_a.pdf - Article Re: Simonds Site Back in Spotlight - Former Simonds Workers Say they Realized Products were Radioactive - September 8, 2000
  • Guterl_08.08_0009_a.pdf - Article Re: Army Corps Plans Simonds Takeover - Former Mill Will be Added to Cleanup List - September 9, 2000
  • Guterl_08.08_0010_a.pdf - Article Re: Maziarz Checks State Role in Simonds Site - September 12, 2000
  • Guterl_08.08_0011_a.pdf - Article Re: Maziarz Checks State Role in Simonds Site - September 12, 2000
  • Guterl_08.08_0012_a.pdf - Article Re: Maziarz Says Residue Must Come Out - September 13, 2000
  • Guterl_08.08_0013_a.pdf - Article Re: DOE to Reveal List of Private Nuclear Work Sites - Processed Weapons Material in '40s, '50s - September 14, 2000
  • Guterl_08.08_0014_a.pdf - Article Re: Family Ponders Connection Between Work, Man's Death - September 18, 2000
  • Guterl_08.08_0015_a.pdf - Article Re: NT Nurse Wants Simonds to 'Own Up' - September 19, 2000
  • Guterl_08.08_0016_a.pdf - Article Re: Report on Steel Plant Challenged - September 20, 2000
  • Guterl_08.08_0017_a.pdf - Article Re: Some Write Off Radiation Claims - September 20, 2000
  • Guterl_08.08_0018_a.pdf - Article Re: Cold War Still Chilling Western NY - September 21, 2000
  • Guterl_08.08_0019_a.pdf - Article Re: Radiation Claims are a Sad Legacy - September 21, 2000
  • Guterl_08.08_0020_a.pdf - Article Re: Demand Cleanup of Sites Connected to Nuclear Weapons Production - September 24, 2000
  • Guterl_08.08_0021_a.pdf - Article Re: Simonds Protest - September 29, 2000
  • Guterl_08.08_0022_a.pdf - Article Re: Sommer Accuses LaFalce of Inaction on Nuclear Waste Site - September 29, 2000
  • Guterl_08.08_0023_a.pdf - Press Release/Public Notice Re: Corps Assigned Potential Site - October 5, 2000
  • Guterl_08.08_0024_a.pdf - Article Re: Guterl Site Considered for N-Waste - October 5, 2000
  • Guterl_08.08_0025_a.pdf - Article Re: Nuclear Sites Made Public - Firms Did Weapons Work - October 6, 2000
  • Guterl_08.08_0026_a.pdf - Article Re: Simonds Study May Point to Feds Responsibility: If the Government is to Blame for Contaminants, the U.S. Army Corps of Engineers will Clean Up the Site - October 6, 2000
  • Guterl_08.08_0027_a.pdf - Article Re: Study of Simonds Initiated by Corps - October 6, 2000
  • Guterl_08.08_0028_a.pdf - Article Re: Uranium Workers' Benefits May Rise - October 6, 2000
  • Guterl_08.08_0029_a.pdf - Article Re: Checking for Radioactivity Around the Old Simonds Plant - October 12, 2000
  • Guterl_08.08_0030_a.pdf - Article Re: Former Atomic Site in Lockport Under Investigation - October 15, 2000
  • Guterl_08.08_0031_a.pdf - Article Re: Guterl Steel Becomes Army Corps Site - October 16, 2000
  • Guterl_08.08_0032_a.pdf - Article Re: Former Atomic Site Under Investigation - October 29, 2000
  • Guterl_08.08_0033_a.pdf - Article Re: Bill Holds Money for Nuclear Weapons Workers - October 30, 2000
  • Guterl_08.08_0034_a.pdf - Article Re: Data Sought from Simonds Employees - October 30, 2000
  • Guterl_08.08_0035_a.pdf - Article Re: Former Lockport Simonds Plant Workers Could Get Big Bucks From US - November 6, 2000
  • Guterl_08.08_0036_a.pdf - Article Re: Info Sought from Guterl Employees - November 19, 2000
  • Guterl_08.08_0037_a.pdf - Fact Sheet/Newsletter Re: Guterl Site Information Session to be Held - November 30, 2000
  • Guterl_08.08_0038_a.pdf - Press Release/Public Notice Re: Guterl Site Media Availability Session to be Held - December 8, 2000
  • Guterl_08.08_0039_a.pdf - Article Re: Corps of Engineers to Probe Old N-Site - December 12, 2000
  • Guterl_08.08_0040_a.pdf - Article Re: Simonds Contamination Forum Set for Feb. 6 - January 12, 2001
  • Guterl_08.08_0041_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation Information Sessions to be Held - January 30, 2001
  • Guterl_08.08_0042_a.pdf - Article Re: Simonds Meetings Draw Crowds - February 7, 2001
  • Guterl_08.08_0043_a.pdf - Article Re: Hundreds Seek Info & Money at Lockport Simonds Radioactivity Meeting - February 9, 2001
  • Guterl_08.08_0044_a.pdf - Article Re: Guterl Steel FUSRAP Site - February 22, 2001
  • Guterl_08.08_0045_a.pdf - Article Re: FUSRAP Related Links - March 9, 2001
  • Guterl_08.08_0046_a.pdf - Article Re: Labor Secretary Balks at Nuclear Workers Program - March 22, 2001
  • Guterl_08.08_0047_a.pdf - Article Re: NRC Failure at Early Nuclear Sites - Nuclear Waste Illegally Dumped in Cheektowaga, NY - April 25, 2001
  • Guterl_08.08_0048_a.pdf - Article Re: Great Lakes and Ohio River Division FUSRAP Sites - May 16, 2001
  • Guterl_08.08_0049_a.pdf - Press Release/Public Notice Re: The Bomb that Fell on Niagara - May 30, 2001
  • Guterl_08.08_0050_a.pdf - Article Re: Guterl Steel Documents - June 6, 2001
  • Guterl_08.08_0051_a.pdf - Article Re: Army Corps Willing to Seek Study of NL Pollution's Impact on Health - July 12, 2001
  • Guterl_08.08_0052_a.pdf - Article Re: Effort Aims to Aid Radiation Victims - July 25, 2001
  • Guterl_08.08_0053_a.pdf - Article Re: The Atomic Age Begins - August 13, 2001
  • Guterl_08.08_0054_a.pdf - Article Re: Sick Workers Owed Money: Meetings Help Those who Qualify for Compensation - November 11, 2001
  • Guterl_08.08_0055_a.pdf - Article Re: LaFalce Seeks Study on Cancer Rates - January 17, 2002
  • Guterl_08.08_0056_a.pdf - Press Release/Public Notice Re: Steel Company Shuts Down - July 13, 2002
  • Guterl_08.08_0057_a.pdf - Article Re: Act Before More Jobs are Lost - July 27, 2002
  • Guterl_08.08_0058_a.pdf - Article Re: New Polymer Coating Immobilizes Chernobyl Radioactive Waste - September 18, 2002
  • Guterl_08.08_0059_a.pdf - Article Re: Plant that Nearly Closed Seeks Discount Power to Expand - November 28, 2005
  • Guterl_08.08_0060_a.pdf - Article Re: Vote Set on Collecting Outwater Park Soil - March 19, 2007
  • Guterl_08.08_0061_a.pdf - Press Release/Public Notice Re: Guterl: Still Waiting on Clean Bill - March 24, 2007
  • Guterl_08.08_0062_a.pdf - Article Re: Still Waiting for a Clean Bill - March 25, 2007
  • Guterl_08.08_0063_a.pdf - Article Re: Stop the N-Worker Delays - May 16, 2007
  • Guterl_08.08_0064_a.pdf - Press Release/Public Notice Re: Progress on Former Guterl Specialty Steel Corporation Site - May 30, 2007
  • Guterl_08.08_0065_a.pdf - Press Release/Public Notice Re: Attention: Former Simonds Steel Employees - Notice of Class Action Lawsuit - February 1, 2008
  • Guterl_08.08_0066_a.pdf - Press Release/Public Notice Re: Corps of Engineers Completes Remedial Investigation of Former Guterl Specialty Steel Site - August 23, 2010
  • Guterl_08.08_0067_a.pdf - Press Release/Public Notice Re: Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort - February 11, 2011
  • Guterl_08.08_0068_a.pdf - Article Re: Simonds Workers Eligible for More Medical Benefits - February 28, 2011
  • Guterl_08.08_0069_a.pdf - Article Re: Lockport Firm Probe Set After DEC Survey Reveals Site may be Contaminated - June 16, 1988
  • Guterl_08.08_0070_a.pdf - Article Re: Site Cleanup Wanted - Fed Asked to Act at Lockport Location - June 2, 1996
  • Guterl_08.08_0071_a.pdf - Article Re: State Asking Feds to Clean Up Contaminated Steel Plant Site - June 3, 1996
  • Guterl_08.08_0072_a.pdf - Article Re: State Moves to Block Abandonment of Radioactive Waste Site - June 3, 1996
  • Guterl_08.08_0073_a.pdf - Article Re: Cleanup Overdue at Guterl - July 9, 1996
  • Guterl_08.08_0074_a.pdf - Article Re: State will Survey Radiation Levels at Lockport Site - June 21, 1999
  • Guterl_08.08_0075_a.pdf - Article Re: Materials Found in Field Examined for Hazards - July 5, 1999
  • Guterl_08.08_0076_a.pdf - Article Re: Tests Indicate No Danger in Area of Steel Plant Site - November 21, 1999
  • Guterl_08.08_0077_a.pdf - Article Re: Toxic Exposure Kept Secret - September 6, 2000
  • Guterl_08.08_0078_a.pdf - Article Re: Hearings Sought on Toxic Exposure - September 7, 2000
  • Guterl_08.08_0079_a.pdf - Article Re: Contaminated Communities Remain - September 8, 2000
  • Guterl_08.08_0080_a.pdf - Article Re: New Report Says Government Misled Employees about Radioactive Materials - September 8, 2000
  • Guterl_08.08_0081_a.pdf - Article Re: Corps of Engineers to Add Simonds Site to Cleanup Plan - September 11, 2000
  • Guterl_08.08_0082_a.pdf - Article Re: Study Calls Simonds Radiation Negligible; Maziarz Says Residue Must Come Out - September 13, 2000
  • Guterl_08.08_0083_a.pdf - Article Re: Nuclear Sites Made Public Firms Did Weapons Work - September 21, 2000
  • Guterl_08.08_0084_a.pdf - Press Release/Public Notice Re: Statement on USACE Role at the Guterl Site - October 4, 2000
  • Guterl_08.08_0085_a.pdf - Article Re: Bill Could Benefit Simonds Workers - October 12, 2000
  • Guterl_08.08_0086_a.pdf - Article Re: Guterl Site Considered for N-Waste - October 15, 2000
  • Guterl_08.08_0087_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corp. Information Session - December 4, 2000
  • Guterl_08.08_0088_a.pdf - Press Release/Public Notice Re: Information Session regarding the Guterl Specialty Steel Corp. Site - December 11, 2000
  • Guterl_08.08_0089_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation Information Session Cancelled - December 12, 2000
  • Guterl_08.08_0090_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation Media Availability Session Cancelled - December 12, 2000
  • Guterl_08.08_0091_a.pdf - Article Re: Radiation Exposure Site List Raises Questions - January 13, 2001
  • Guterl_08.08_0092_a.pdf - Article Re: N-Contamination Meeting Rescheduled - January 14, 2001
  • Guterl_08.08_0093_a.pdf - Article Re: Corps Clarifies Role in FUSRAP - January 17, 2001
  • Guterl_08.08_0094_a.pdf - Press Release/Public Notice Re: Attention Former Simonds Steel Employees - Class Action Lawsuit - February 1, 2001
  • Guterl_08.08_0095_a.pdf - Article Re: Information Session Set - February 4, 2001
  • Guterl_08.08_0096_a.pdf - Article Re: Strict Time Limits - U.S. Program Excludes Some Ill N-Workers - July 11, 2001
  • Guterl_08.08_0097_a.pdf - Article Re: Program Offers Aid to Nuclear Workers with Cancer - November 10, 2001
  • Guterl_08.08_0098_a.pdf - Article Re: Radiation Compensation - November 11, 2001
  • Guterl_08.08_0099_a.pdf - Article Re: Former Nuclear Workers Should Attend Workshop - November 12, 2001
  • Guterl_08.08_0100_a.pdf - Article Re: Hundreds Ask about Radiation-Related Illnesses and Long-Ago Jobs - November 16, 2001
  • Guterl_08.08_0102_a.pdf - Article Re: Common Council Floats Pollution Committee - August 7, 2017
  • Guterl_08.10_0001_a.pdf - Meeting Documents Re: Simonds Saw and Steel Briefing - September 15, 2000
  • Guterl_08.10_0003_a.pdf - Meeting Documents Re: Employee Briefing - December 5, 2000
  • Guterl_08.10_0004_a.pdf - Meeting Documents Re: Allvac Employee Briefing Presentation, Fact Sheets and Other Meeting Documents - December 5, 2000
  • Guterl_08.10_0007_a.pdf - Presentation: Guterl Specialty Steel Corporation Information Session February 6, 2001 - February 6, 2001
  • Guterl_08.10_0009_a.pdf - Meeting Documents Re: Results and Comments from the Guterl Information Sessions Survey - February 6, 2001
  • Guterl_08.10_0010_a.pdf - Meeting Documents Re: Results for Guterl Community Assessment Questions Public Information Session 1 p.m. -3 p.m. Session - February 6, 2001
  • Guterl_08.10_0011_a.pdf - Meeting Documents Re: Results for Guterl Community Assessment Questions Public Information Session 7 p.m. - 9 p.m. Session - February 6, 2001
  • Guterl_08.10_0012_a.pdf - Meeting Documents Re: Results of Guterl Information Session Survey - February 6, 2001
  • Guterl_08.10_0017_a.pdf - Restoration Advisory Board Rule Handbook - March 2007
  • Guterl_08.10_0018_a.pdf - Posters: Remedial Investigation Update - Public Meeting - September 30, 2010
  • Guterl_08.10_0019_a.pdf - Presentation: Remedial Investigation Update - Public Meeting - September 30, 2010
  • Guterl_08.10_0022_a.pdf - Meeting Documents Re: Questions for Community Assessment - Unknown
  • Guterl_08.11_0001_a.pdf - Fact Sheet/Newsletter Re: CERCLA/Superfund Information - December 1999
  • Guterl_08.11_0002_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - Radiation - December 1999
  • Guterl_08.11_0003_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - Radiation at FUSRAP Sites - December 1999
  • Guterl_08.11_0004_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - Radioactivity in Common Products - March 2000
  • Guterl_08.11_0005_a.pdf - Fact Sheet/Newsletter Re: A Toxic Tragedy - New York's "Love Canal" Brownfield Site - May 23, 2000
  • Guterl_08.11_0006_a.pdf - Fact Sheet/Newsletter Re: Energy Employees Occupational Illness Compensation Program Act of 2000 - October 24, 2000
  • Guterl_08.11_0007_a.pdf - Fact Sheet/Newsletter Re: Former Guterl Specialty Steel Corporation Description and History - December 2000
  • Guterl_08.11_0008_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - CERCLA - December 2000
  • Guterl_08.11_0009_a.pdf - Fact Sheet/Newsletter Re: FUSRAP Buffalo District - January 2001
  • Guterl_08.11_0010_a.pdf - Fact Sheet/Newsletter Re: Role of the Department of Environmental Conservation at the Simonds Saw and Steel Site - February 2001
  • Guterl_08.11_0011_a.pdf - Reference Document: Energy Employees Occupational Illness Compensation Program Act of 2000 - 2001
  • Guterl_08.11_0012_a.pdf - Fact Sheet: Project Description, Current Status, and Accomplishments - November 26, 2002
  • Guterl_08.11_0013_a.pdf - Press Release/Public Notice Re: FUSRAP Progress on Former Guterl Specialty Steel Corporation Site - May 24, 2005
  • Guterl_08.11_0014_a.pdf - Fact Sheet/Newsletter Re: Guterl Steel Newsletter - June 2007
  • Guterl_08.11_0015_a.pdf - Fact Sheet/Newsletter Re: Guterl Steel Newsletter - March 2008
  • Guterl_08.11_0016_a.pdf - Fact Sheet/Newsletter Re: Site Description, Site History and Current Status - March 2008
  • Guterl_08.11_0017_a.pdf - Fact Sheet/Newsletter Re: Former Guterl Specialty Steel Site Remedial Investigation - August 2010
  • Guterl_08.11_0018_a.pdf - Fact Sheet/Newsletter Re: 2009 Annual Groundwater Monitoring Data Release - October 2010
  • Guterl_08.11_0019_a.pdf - Fact Sheet/Newsletter Re: 2010 Annual Groundwater Monitoring Data Release - May 2011
  • Guterl_08.11_0020_a.pdf - Reference Document: Comprehensive Environmental Response Compensation and Liability Act (CERCLA) Process for FUSRAP - Unknown
  • Guterl_08.11_0021_a.pdf - Fact Sheet: Project Description, Current Status, and Accomplishments - Unknown
  • Guterl_08.11_0022_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - How Big is a Picocurie? - Unknown
  • Guterl_08.11_0023_a.pdf - Fact Sheet/Newsletter Re: FUSRAP - Radiation in the Environment - Unknown
  • Guterl_08.11_0024_a.pdf - Fact Sheet/Newsletter Re: Site Description and Current Status - May 2011
  • Guterl_08.11_0025_a.pdf - Fact Sheet/Newsletter Re: Former Guterl Specialty Steel Site 2012 Environmental Monitoring Report - Unknown
  • Guterl_08.11_0026_a.pdf - Fact Sheet/Newsletter Re: Former Guterl Specialty Steel Corporation Site April 2014 - Unknown
  • Guterl_08.11_0027_a.pdf - Fact Sheet/Newsletter Re: Former Gutero Specialty Steel Site May 2016 Factsheet - May 17, 2016
  • Guterl_08.11_0028_a.pdf - Fact Sheet/Newsletter Re: Buffalo District FUSRAP Remedial Action Program Update 2015 - June 2016
  • Guterl_08.12_0001_a.pdf - Questions and Answers from the Allvac Employee Briefing - December 5, 2000
  • Guterl_08.12_0002_a.pdf - Questions and Answers - Guterl Specialty Steel Public Information Session - February 6, 2001
  • Guterl_08.12_0003_a.pdf - Questions and Answers - Guterl Specialty Steel Public Information Session - February 6, 2001
  • Guterl_08.12_0004_a.pdf - Meeting Documents Re: Questions and Answers: Guterl Specialty Steel Public Information Session (1 p.m. - 3 p.m.) - February 6, 2001
  • Guterl_08.12_0005_a.pdf - Meeting Documents Re: Questions and Answers: Guterl Specialty Steel Public Information Session (7 p.m. - 9 p.m.) - February 6, 2001
  • Guterl_08.12_0006_a.pdf - Reference Document: Frequently Asked Questions – The Guterl Specialty Steel Corporation (Simonds Saw and Steel) - June 2001
  • Guterl_08.13_0001_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - December 12, 2000 - December 3, 2000
  • Guterl_08.13_0002_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - December 12, 2000 - December 3, 2000
  • Guterl_08.13_0003_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - December 12, 2000 - December 3, 2000
  • Guterl_08.13_0004_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 7, 2001
  • Guterl_08.13_0005_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 28, 2001
  • Guterl_08.13_0006_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 28, 2001
  • Guterl_08.13_0007_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 28, 2001
  • Guterl_08.13_0008_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 29, 2001
  • Guterl_08.13_0009_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - February 6, 2001
  • Guterl_08.13_0010_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - December 12, 2000 - December 3, 2000
  • Guterl_08.13_0011_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - December 12, 2000 - December 4, 2000
  • Guterl_08.13_0012_a.pdf - Press Release/Public Notice Re: Guterl Specialty Steel Corporation (Simonds Saw & Steel Company) Information Sessions - February 6, 2001 - January 28, 2001
  • Guterl_08.16_0001_a.pdf - Memo Re: Federal Register Publication for Final Rule - Technical Assistance for Public Participation in Defense Environmental Restoration Activities - February 1998

  • Guterl_08.16_0003_a.pdf - Brochure: Technical Assistance for Public Participation - Unknown